Planning applications in Tameside Metropolitan Borough Council

Approved

90%

of 91 decided applications

Typical time to a decision

55

days from validation, over 95 decisions

Registered in the last 90 days

215

95 decided in that time

#40 of 56 for share approved#44 of 59 for speedAll councils we read: 92% approved

In short

Of 91 decided applications we have read at Tameside Metropolitan Borough Council in the last two years, 90% were approved.

That is number 40 of the 56 councils we have published a rate for.

A decision typically takes 55 days from validation.

It approves extensions and alterations more often (97% of 32) than changes of use (50% of 10).

Where we have read the decision notice, the reason most often given for refusal is parking, access and traffic (57% of 7 notices).

Written automatically from the figures on this page. It adds nothing the numbers do not show. It describes this council's record and does not predict any single application.

AI-written

Analyst note on Tameside Metropolitan Borough Council

Written by an AI model from the figures on this page only, and checked so it cannot introduce a number that is not here. It describes the council's record, does not predict any application, and is not advice. Refreshed daily.

Know the day something is registered in Tameside Metropolitan Borough Council

Set an alert for your postcode and we email you when an application appears and again when it is decided. Free for 5 alerts. Pro is £5 a month and adds the council record, nearby precedents and site history on every application.

Try it

How does Tameside Metropolitan Borough Council treat your kind of scheme?

We have read too few decided advertisements and signage at Tameside Metropolitan Borough Council to publish a rate yet (we need 10). Across the 56 councils with figures it is 86% approved, from 58 decisions.

This is the council's record for this kind of scheme, not a prediction for yours. Whether a specific scheme succeeds depends on the site, the design and the neighbours.

Have a particular site in Tameside Metropolitan Borough Council? On Pro (£5 a month) every application shows how schemes with the same features fared here, approved precedents nearby, and what earlier applications on the same site were refused for.

See it on a real application

What Tameside Metropolitan Borough Council approves, by kind of scheme

Only kinds with at least 10 decided applications are shown.

  • extensions and alterations97% approved · 32 decided · 55 days
  • changes of use50% approved · 10 decided · 54 days

Why Tameside Metropolitan Borough Council refuses

From 7 decision notices we have read (all kinds of application). A notice can give more than one reason.

  • Parking, access and traffic · 57% of refusals

    “The development would have an unacceptable impact on the safety and convenience of highway users and would fail to demonstrate that safe and suitable access for all can be achieved due to the increase in activity as a result of the proposed ground floor Class E operational use and existing high level demand of on stree”

  • Neighbours' light, privacy and noise · 57% of refusals

    “The parcel locker, by reason of its scale, form, design and external appearance, together with its use of utilitarian materials, constitutes an uncharacteristic and visually intrusive addition to the street scene. The development appears discordant from the architectural character of the host premises and the prevailin”

Recent activity

Applications registered per week, last 12 weeks

Most common kinds in the last 90 days

  • extensions and alterations67
  • changes of use30
  • new homes18
  • demolition10

Latest applications in Tameside Metropolitan Borough Council

As registered with the council. Open any one with a free account to see how this council treats schemes like it.

Set Tameside Metropolitan Borough Council against another council

Where Tameside Metropolitan Borough Council sits

Point at a dot to see a council. Darker means a higher share of decided applications approved.

85% or more70 to 84%50 to 69%under 50%too little history

Nearby councils

All councils

Is your postcode covered?

Check an address in or near Tameside Metropolitan Borough Council and set an alert in a minute.

Start with your postcode

We'll tell you straight away whether we cover your council.

Questions people ask about Tameside Metropolitan Borough Council

What is the planning approval rate in Tameside Metropolitan Borough Council?
Of 91 decided applications we have read at Tameside Metropolitan Borough Council in the last two years, 90% were approved. Withdrawn and unclear outcomes are not counted. These are the applications we have read, not the council's full archive.
How long does Tameside Metropolitan Borough Council take to decide a planning application?
The typical time from validation to decision is 55 days, across 95 decisions we have read.
Why does Tameside Metropolitan Borough Council refuse planning applications?
Where we have read the decision notice, the reason most often given is parking, access and traffic, in 57% of 7 notices.

Where these figures come from

Worked out from 268 applications we have read from Tameside Metropolitan Borough Council's own public planning register, with decisions between 22 September 2026 and 31 October 2026. Last read 6 November 2026. A rate needs at least 10 decided applications. Withdrawn and unclear outcomes are not counted, and neither are discharges of conditions, minor amendments, certificates of lawfulness or prior-approval notices, which are not decisions on a scheme. These are the applications we have read, not the council's full archive. The council's own record is the official source — its planning register. Planning data is public sector information under the Open Government Licence v3.0.

Know the day something is registered in Tameside Metropolitan Borough Council

Set an alert for your postcode and we email you when an application appears and again when it is decided. Free for 5 alerts. Pro is £5 a month and adds the council record, nearby precedents and site history on every application.